Please use this identifier to cite or link to this item:
http://kmutnb-ir.kmutnb.ac.th/jspui/handle/123456789/583| Title: | A BIM-Enabled Lean Construction Framework for Construction-Phase Waste Identification and Optimization A BIM-Enabled Lean Construction Framework for Construction-Phase Waste Identification and Optimization |
| Authors: | YUANYU HE หยวนหยู เหอ CHAYATHACH PHUAKSAMAN ชยธัช เผือกสามัญ King Mongkut's University of Technology North Bangkok มหาวิทยาลัยเทคโนโลยีพระจอมเกล้าพระนครเหนือ chayathachp@kmutnb.ac.th |
| Keywords: | Construction-phase waste Building Information Modeling(BIM) Lean Construction Waste identification |
| Issue Date: | 17-Nov-2026 |
| Publisher: | King Mongkut's University of Technology North Bangkok |
| Abstract: | The construction phase is characterized by a substantial presence of non-value-adding activities, such as waiting, rework, information delays, and resource conflicts. These activities do not contribute to value creation but consume significant resources, thereby constituting a fundamental cause of inefficiencies in construction projects. Traditional construction management approaches primarily rely on experience-based decision-making and ex post control, making it difficult to systematically identify and eliminate such waste at its root. In recent years, Building Information Modeling (BIM) has provided a digital and visualized means for construction management; however, a clear and systematic methodology for leveraging BIM to reduce construction-phase waste remains lacking. Guided by Lean Construction theory, this study aims to explore methods and pathways for reducing construction-phase waste through the application of BIM. First, considering the characteristics of the construction phase, construction waste is systematically classified into nine categories: waiting; rework and defects; transportation; motion; inventory and work-in-progress; over-processing; overproduction; making-do; and information and collaboration waste. Second, the functional applications of BIM in the construction phase are analyzed to clarify its role in waste identification and prevention. A comparative analysis between BIM-enabled and non-BIM scenarios is conducted, and a mapping framework linking BIM functionalities to different types of construction-phase waste is developed. The results indicate that BIM contributes to waste reduction primarily through two mechanisms. First, at the design stage, BIM helps eliminate the root causes of waste by identifying and resolving potential issues through clash detection, integrated design coordination, and design development support, thereby preventing design defects from propagating into the construction phase. Second, during the construction phase, BIM enhances process management through 4D simulation, collaborative platforms, and smart site technologies, effectively reducing waste caused by information delays and poor coordination. From the perspective of construction-phase waste, this study systematically establishes the relationships between BIM functionalities and waste types and further demonstrates the practical effectiveness of BIM in reducing construction-phase waste through case-based analysis. The findings provide practical guidance for construction enterprises in selecting and implementing BIM technologies in project delivery. This study provides a theoretical foundation for the application of BIM in reducing construction-phase waste. |
| URI: | http://kmutnb-ir.kmutnb.ac.th/jspui/handle/123456789/583 |
| Appears in Collections: | FACULTY OF ENGINEERING |
Files in This Item:
| File | Size | Format | |
|---|---|---|---|
| s6701094866612.pdf | 1.84 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.