<?xml version="1.0" encoding="UTF-8"?>
<rdf:RDF xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns="http://purl.org/rss/1.0/" xmlns:dc="http://purl.org/dc/elements/1.1/">
  <channel rdf:about="http://kmutnb-ir.kmutnb.ac.th/jspui/handle/123456789/1">
    <title>DSpace Community:</title>
    <link>http://kmutnb-ir.kmutnb.ac.th/jspui/handle/123456789/1</link>
    <description />
    <items>
      <rdf:Seq>
        <rdf:li rdf:resource="http://kmutnb-ir.kmutnb.ac.th/jspui/handle/123456789/584" />
        <rdf:li rdf:resource="http://kmutnb-ir.kmutnb.ac.th/jspui/handle/123456789/583" />
        <rdf:li rdf:resource="http://kmutnb-ir.kmutnb.ac.th/jspui/handle/123456789/582" />
        <rdf:li rdf:resource="http://kmutnb-ir.kmutnb.ac.th/jspui/handle/123456789/581" />
      </rdf:Seq>
    </items>
    <dc:date>2026-11-22T14:58:57Z</dc:date>
  </channel>
  <item rdf:about="http://kmutnb-ir.kmutnb.ac.th/jspui/handle/123456789/584">
    <title>Performance Comparison of Clustering Algorithms using Machine Learning Techniques for Segmenting Customers in Restaurant Businesses</title>
    <link>http://kmutnb-ir.kmutnb.ac.th/jspui/handle/123456789/584</link>
    <description>Title: Performance Comparison of Clustering Algorithms using Machine Learning Techniques for Segmenting Customers in Restaurant Businesses; การเปรียบเทียบประสิทธิภาพของขั้นตอนวิธีการจัดกลุ่มด้วยเทคนิคการเรียนรู้ของเครื่อง สำหรับการแบ่งกลุ่มลูกค้าธุรกิจร้านอาหาร
Abstract: This study compares quantum machine learning (QML) clustering algorithms with classical algorithms (K-Means DBSCAN GMM) for customer segmentation of nighttime restaurants using data from 6,025 customers collected over 3 months in Bangkok. Performance was evaluated using Silhouette Score Davies-Bouldin Index Cluster Cohesion and processing time. Results show that DBSCAN achieved the highest metric scores but generated 54 overly fragmented clusters unsuitable for practical use. QML demonstrated limitations in both computational performance and clustering quality (Silhouette Score = 0.4090) reflecting current quantum computing constraints. GMM emerged as the best method with the highest Silhouette Score (0.4704) lowest Davies-Bouldin Index (0.9014), superior Cluster Cohesion (2.2171), and generated 10 practical clusters, offering the best balance between clustering quality computational efficiency and business applicability. ; การศึกษานี้เปรียบเทียบอัลกอริทึมการจัดกลุ่มด้วยการเรียนรู้ของเครื่องเชิงควอนตัม (QML) กับอัลกอริทึมแบบคลาสสิก (K-Means DBSCAN GMM) ในการแบ่งกลุ่มลูกค้าร้านอาหารกลางคืน โดยใช้ข้อมูล 6,025 ราย จากกรุงเทพฯ เป็นเวลา 3 เดือน ประเมินผลด้วย       Silhouette Score Davies-Bouldin Index Cluster Cohesion และเวลาประมวลผล            ผลการศึกษาพบว่า DBSCAN ให้ค่าเมตริกสูงสุดแต่สร้าง 54 กลุ่มที่กระจายเกินไป QML มีข้อจำกัดทั้งประสิทธิภาพและคุณภาพต่ำ (Silhouette Score = 0.4090) ส่วน GMM เป็นวิธีที่ดีที่สุด    ด้วย Silhouette Score สูงสุด (0.4704) Davies-Bouldin Index ต่ำสุด (0.9014)            Cluster Cohesion ดีกว่า (2.2171) และสร้าง 10 กลุ่มที่เหมาะสมต่อการใช้งานจริง มีความสมดุลที่ดีระหว่างคุณภาพการจัดกลุ่ม ประสิทธิภาพการคำนวณ และประโยชน์ทางธุรกิจ </description>
    <dc:date>2026-11-17T00:00:00Z</dc:date>
  </item>
  <item rdf:about="http://kmutnb-ir.kmutnb.ac.th/jspui/handle/123456789/583">
    <title>A BIM-Enabled Lean Construction Framework for Construction-Phase Waste Identification and Optimization</title>
    <link>http://kmutnb-ir.kmutnb.ac.th/jspui/handle/123456789/583</link>
    <description>Title: A BIM-Enabled Lean Construction Framework for Construction-Phase Waste Identification and Optimization; A BIM-Enabled Lean Construction Framework for Construction-Phase Waste Identification and Optimization
Abstract: The construction phase is characterized by a substantial presence of non-value-adding activities, such as waiting, rework, information delays, and resource conflicts. These activities do not contribute to value creation but consume significant resources, thereby constituting a fundamental cause of inefficiencies in construction projects. Traditional construction management approaches primarily rely on experience-based decision-making and ex post control, making it difficult to systematically identify and eliminate such waste at its root. In recent years, Building Information Modeling (BIM) has provided a digital and visualized means for construction management; however, a clear and systematic methodology for leveraging BIM to reduce construction-phase waste remains lacking.&#xD;Guided by Lean Construction theory, this study aims to explore methods and pathways for reducing construction-phase waste through the application of BIM. First, considering the characteristics of the construction phase, construction waste is systematically classified into nine categories: waiting; rework and defects; transportation; motion; inventory and work-in-progress; over-processing; overproduction; making-do; and information and collaboration waste. Second, the functional applications of BIM in the construction phase are analyzed to clarify its role in waste identification and prevention. A comparative analysis between BIM-enabled and non-BIM scenarios is conducted, and a mapping framework linking BIM functionalities to different types of construction-phase waste is developed.&#xD;The results indicate that BIM contributes to waste reduction primarily through two mechanisms. First, at the design stage, BIM helps eliminate the root causes of waste by identifying and resolving potential issues through clash detection, integrated design coordination, and design development support, thereby preventing design defects from propagating into the construction phase. Second, during the construction phase, BIM enhances process management through 4D simulation, collaborative platforms, and smart site technologies, effectively reducing waste caused by information delays and poor coordination.&#xD;From the perspective of construction-phase waste, this study systematically establishes the relationships between BIM functionalities and waste types and further demonstrates the practical effectiveness of BIM in reducing construction-phase waste through case-based analysis. The findings provide practical guidance for construction enterprises in selecting and implementing BIM technologies in project delivery.&#xD;This study provides a theoretical foundation for the application of BIM in reducing construction-phase waste.</description>
    <dc:date>2026-11-17T00:00:00Z</dc:date>
  </item>
  <item rdf:about="http://kmutnb-ir.kmutnb.ac.th/jspui/handle/123456789/582">
    <title>Improving government network infrastructure to align with NIST Cybersecurity frameworks.</title>
    <link>http://kmutnb-ir.kmutnb.ac.th/jspui/handle/123456789/582</link>
    <description>Title: Improving government network infrastructure to align with NIST Cybersecurity frameworks.; การปรับปรุงโครงสร้างพื้นฐานระบบเครือข่ายภาครัฐเพื่อให้สอดคล้องกับกรอบทำงานด้านความมั่นคงปลอดภัยไซเบอร์ของ NIST
Abstract: This independent study aims to analyze and assess risks related to the infrastructure of a government agency’s data center in alignment with the NIST Cybersecurity Framework 2.0. The study focuses on key risk areas, including access control, physical security, incident management, system recovery and system monitoring and auditing.&#xD;The study applies Gap Analysis to compare the current operations of the data center with the guidelines of the NIST Cybersecurity Framework 2.0. In addition, Key Performance Indicators (KPIs) are defined to measure the level of alignment and support the prioritization of risks in a systematic manner.&#xD;The expected outcome of this study is to enable the organization to identify weaknesses, assess its cybersecurity readiness, and develop recommendations for reducing cybersecurity risks in a structured and appropriate manner within the context of a government agency.; การค้นคว้าอิสระนี้มีวัตถุประสงค์เพื่อวิเคราะห์และประเมินความเสี่ยงด้านโครงสร้างพื้นฐานของศูนย์ข้อมูลของหน่วยงานภาครัฐ ให้สอดคล้องกับกรอบการทำงานด้านความมั่นคงปลอดภัย ไซเบอร์ของ NIST Cybersecurity Framework 2.0 โดยมุ่งเน้นการประเมินความเสี่ยง ในด้านการควบคุมการเข้าถึง การรักษาความปลอดภัยทางกายภาพ การบริหารจัดการเหตุการณ์ ที่ไม่คาดคิด การกู้คืนระบบ และการติดตามตรวจสอบการทำงานของระบบ การศึกษานี้ใช้วิธีการวิเคราะห์ช่องว่าง (Gap Analysis) เพื่อเปรียบเทียบการดำเนินงานปัจจุบันของศูนย์ข้อมูลกับแนวทางตามกรอบ NIST พร้อมทั้งกำหนดตัวชี้วัดผลการประเมิน (KPI) เพื่อวัดระดับความสอดคล้องและจัดลำดับความสำคัญของความเสี่ยง ผลการศึกษาคาดว่าจะช่วยให้หน่วยงานสามารถระบุจุดอ่อน ประเมินระดับความพร้อม และจัดทำข้อเสนอแนะในการลดความเสี่ยงด้านความมั่นคงปลอดภัยไซเบอร์ได้อย่างเป็นระบบและเหมาะสมกับบริบทของหน่วยงานภาครัฐ</description>
    <dc:date>2026-11-17T00:00:00Z</dc:date>
  </item>
  <item rdf:about="http://kmutnb-ir.kmutnb.ac.th/jspui/handle/123456789/581">
    <title>Analysis and Numerical Average Run Length of MEWMA, EEWMA, and NEEWMA Control Charts using the Markov Chain Approach</title>
    <link>http://kmutnb-ir.kmutnb.ac.th/jspui/handle/123456789/581</link>
    <description>Title: Analysis and Numerical Average Run Length of MEWMA, EEWMA, and NEEWMA Control Charts using the Markov Chain Approach; การวิเคราะห์สูตรและคำนวนเชิงตัวเลขค่าความยาวรันเฉลี่ยของแผนภูมิควบคุม MEWMA EEWMA และ NEEWMA โดยวิธีลูกโซ่มาร์คอฟ
Abstract: This research presents a method for computing the average run length (ARL) of the Modified Exponentially Weighted Moving Average (MEWMA), Extended Exponentially Weighted Moving Average (EEWMA), and New Extended Exponentially Weighted Moving Average (NEEWMA) control charts, which extend the Exponentially Weighted Moving Average (EWMA) control chart and are efficient in detecting small shifts in a process. The ARL is computed by the Markov Chain Approach (MCA), which relies on the cumulative distribution function and on the transitions between in-control and out-of-control states. The monitoring statistics of these charts are formed from more than one observation, so that the transition probability is governed by a joint rather than a marginal distribution and the classical construction cannot be applied directly. Two approaches are therefore proposed: the Joint Distribution Approach (JDA), which evaluates the joint distribution exactly and is developed for the MEWMA chart, and the Point Estimator Approach (PEA), which replaces the lagged observations by an estimator of the process mean and extends to a statistic of any lag depth. Closed-form expressions for the ARL and the standard deviation of the run length are derived, and the process is assumed to follow continuous symmetric, continuous asymmetric, and discrete distributions. Accuracy is assessed by five measures of error together with the computation time required. The proposed method agrees closely with Monte Carlo simulation, the two never differing by as much as one run-length unit under a standard normal process, and its computation time is fixed by the number of partitions of the state space alone, whereas the time required by simulation rises with the length of the runs generated. The method is further used to explain chart behaviour under each form of process distribution, where the effect of the second and third weighted parameters is found to reverse between distributional families, and the charts are applied to four real-world datasets.</description>
    <dc:date>2026-11-17T00:00:00Z</dc:date>
  </item>
</rdf:RDF>

